By April 13: Complete NCC’s Waterfront Park Survey

8 04 2016

The NCC is developing plans for the linear park to be built along the Parkway after LRT construction is done. Plans include options for very substantial changes to Rochester Field, the Parkway itself, and the waterfront. As part of the NCC’s ongoing public consultation for this park there’s an online questionnaire for feedback from residents.

The deadline for completing the survey is April 13th.

The survey and extensive background information about the options described in the survey can be found here:

Public Consultation on the Plan for the Sir John A. Macdonald Parkway Riverfront Linear Park

 

 

Advertisements

Actions

Information